Installing solar panels

The first two solar panels have now been installed and are performing tremendously well.
I first hooked them up in series and later in parallel for testing purposes and it seems the best option (for how the panels are placed at this time) is connecting them up in parallel.
My record to date (on a particular sunny day) was a little more than 60 Ah from one panel alone.
Of course this was in perfect conditions and the average Ah a day will be far lower, but this already exited my expectations about how much energy one panel would be able to produce in one day.
See the pictures below for more details about the panels I used. On a later date I will be writing up a more detailed blog post about how I tested my setup and why I choose parallel hookup instead of in series.
Also created a new battery enclosure for the starter battery to make more room for the two 200 aH batteries that will go alongside the starter battery.
Plus redid all the wiring to and from the batteries to make the setup more compact and less messy (which can, and will still be approved upon)

Hoisting the mast onto the boat and the first real sailing trip

Although I kept and stored all the old rigging to reuse with the new mast, I still decided that in the end it was a better to just buy completely new rigging.
Sure, it costs a lot of euro’s to do so, but this way I can be sure that when the winds are blowing strong the mast will stay on the boat and nothing will break (which would have dire consequences when under sail).
I hired a company to do all of the rigging onside (at the marina), which meant that within 3-4 hours the mast was standing on the boat and all the rigging was done.
On the same day we took the Seadog out to the lake and hoisted up the jib (front sail). And even with wind speed’s of only 2 Beaufort Seadog was going quite fast.
We couldn’t yet take up the main sail because not everything was ready for that yet. But a few days later we also took up the main. That day there was even less wind, but Seadog still kept on moving. And at the end of the day wind speed’s went up to 3 Beaufort and we were speeding through the water!
The mast hight for the Seadog now is 12.65 meters, and the bridges at the Gooiermeer have a hight of 12.80-13 meters.
Which means it’s going to be quite intensive every time we go under the bridges. Especially if there are big waves, but the first test runs went good, so I guess there’s nothing to worry about….
As always there’s still a lot to do, but from now on it’s also time to go sailing now and again 🙂 (finally)!