Ice, rain and snow

As you can see there were some snowy days here in the Netherlands. But nevertheless work continued aboard the Seadog.

On the starboard side some of the holes that were made to access the through hull bolts were patched up.  And this time two hose connectors were laminated at starboard and port side at the back of the ship to allow excess rainwater to flow out of that hallow space in the top of the hull. Which are connected right into the drainage pipes underneath the waterline. Also all hoses aboard the entire ship have now have been replaced by new hoses with  stainless steel hose clamps. Plus, the storage lockers at the back of the ship finally got there much-needed cleanup as well.

The building of the custom fridge / freezer has not  halted, but only had some minor progress in favour of the above tasks. All the needed supplies are now aboard, so hopefully more on this subject in the next post.

 

Building a custom fridge box inside a sailboat: Step 1 – Preparations

This past week preparations were made for building a new fridge box inside the boat. There has always been a big empty space beneath the kitchen counter that has been hard to reach ever since the stairs were moved there. The fridge box will be placed in that empty space and will be accessible from the top. Although in this case there really was no other option, it actually always a good idea to have the fridge opening at the top. This way the cool air inside the box will not fall out when you open the door. The plan is to insulate the fridge with a minimum of 10 cm insulation to further increase the efficiency of the fridge box. In some places even more insulation will be used, especially in the small space where the freezing section will be.

To compensate for the immense thickness of insulation there will need to be a lot of empty space available underneath the kitchen counter. Therefor all unneeded planks and beams were removed and some much-needed cleaning and painting was done to prepare this space for the placement of the new fridge box.
The holes that were made to access some of the bolts that go through the hull of the boat were also closed off again. Plus some of the 230 volt wiring was redone now that those parts were easy to access.

The cooling unit used to cool the fridge box will be the Isotherm 3251 ASU Self-Pumping Water-Cooled Component System which is one of the most efficient systems out there, while also being near silent (no spinning fan). With this system the sea water-cooled skin fitting/heat exchanger replaces the air-cooled condenser and cooling fan that normal systems use. The through-hull fitting of the kitchen sink was replaced with this special fitting last month when the boat was on the hard (out of the water).

Isotherm 3251 ASU Self-Pumping Water-Cooled Component System

The building of the actual fridge box will follow in an upcoming post. Till then, fair winds and following seas…

Installing solar panels

The first two solar panels have now been installed and are performing tremendously well.
I first hooked them up in series and later in parallel for testing purposes and it seems the best option (for how the panels are placed at this time) is connecting them up in parallel.
My record to date (on a particular sunny day) was a little more than 60 Ah from one panel alone.
Of course this was in perfect conditions and the average Ah a day will be far lower, but this already exited my expectations about how much energy one panel would be able to produce in one day.
See the pictures below for more details about the panels I used. On a later date I will be writing up a more detailed blog post about how I tested my setup and why I choose parallel hookup instead of in series.

Also created a new battery enclosure for the starter battery to make more room for the two 200 aH batteries that will go alongside the starter battery.
Plus redid all the wiring to and from the batteries to make the setup more compact and less messy (which can, and will still be approved upon)

Hoisting the mast onto the boat and the first real sailing trip

Although I kept and stored all the old rigging to reuse with the new mast, I still decided that in the end it was a better to just buy completely new rigging.
Sure, it costs a lot of euro’s to do so, but this way I can be sure that when the winds are blowing strong the mast will stay on the boat and nothing will break (which would have dire consequences when under sail).
I hired a company to do all of the rigging onside (at the marina), which meant that within 3-4 hours the mast was standing on the boat and all the rigging was done.
On the same day we took the Seadog out to the lake and hoisted up the jib (front sail). And even with wind speed’s of only 2 Beaufort Seadog was going quite fast.
We couldn’t yet take up the main sail because not everything was ready for that yet. But a few days later we also took up the main. That day there was even less wind, but Seadog still kept on moving. And at the end of the day wind speed’s went up to 3 Beaufort and we were speeding through the water!

The mast hight for the Seadog now is 12.65 meters, and the bridges at the Gooiermeer have a hight of 12.80-13 meters.
Which means it’s going to be quite intensive every time we go under the bridges. Especially if there are big waves, but the first test runs went good, so I guess there’s nothing to worry about….

As always there’s still a lot to do, but from now on it’s also time to go sailing now and again 🙂 (finally)!

This slideshow requires JavaScript.

Painting the mast and building a custom mast foot

It’s taken more than a few weeks (more like a few months), but the Seadog can Sail!
We had to build a custom mast foot and I decided to paint the new mast white.
It’s not really necessary to paint an aluminium mast, and it’s also not easy because paint does not want to stick to aluminium. But I’m very happy with the result and this means I can also paint the second mast with the same color white to make it look identical to the main mast.

See some pictures below of the process. The next post will show when the mast was hoisted onto the boat and the first time we took here for a sail.

Building custom mast foot

This slideshow requires JavaScript.

Painting the mast and mast foot

This slideshow requires JavaScript.

Getting a main mast (and the first real voyage)

A few weeks ago my father found a secondhand aluminium mast that would be perfect as the main mast aboard the Seadog.
It has been laying around besides a warehouse at a shipyard for more than 15 years. But it actually has never been used before, so structurally it should be as good as new.
Also, this mast is build extra sturdy when compared to most other masts of this size.
The downside is that there came no rigging and very little fittings with this mast. Plus it’s still about 1.5 meters to long and looks a little dirty (see photo’s below).
But we decided this was the way to go.

This slideshow requires JavaScript.

The mast besides the warehouse

We first went to Medemblik (where the shipyard was located) to inspect the mast in person and make a few photo’s and decided if it was doable to use this particular mast aboard the Seadog. Conclusion: it could be done.

This slideshow requires JavaScript.

Getting the mast down, cleaning and inspection

Because the warehouse was located at a shipyard, we could go and fetch the mast easily by water with the Seadog. Or so we thought….
The weather forecast for the weekend we planned to go and fetch the mast was all but mild weather, but we decided to go anyway.
Turned out to be a pretty nice (be it a little bumpy) journey and also a good test to see how Seadog does in hard winds (on only the engine).

This slideshow requires JavaScript.

Getting to Medemblik

There where a few engine troubles along the way, but this turned out to be because of an empty diesel tank (and a malfunctioning tank gage / vlotter).

This slideshow requires JavaScript.

Cutting the mast in half for transport and getting it aboard

The journey back (with the mast tied securely to the boat) turned out to be with the wind at our backs and luckily not as bumpy as the first two days.

This slideshow requires JavaScript.

Journey back from Medemblik to Huizen

After three days we where back in the home harbour and work could begin to prepare the mast for use aboard Seadog.

This slideshow requires JavaScript.

Back in Huizen and putting the mast back together